SEVILLE CRUISE TERMINAL (PHASE II)

termex21

Client: Port Authority of Seville
Architects: Arquitectos Hombre de Piedra+ Buró4 Arquitectos
Date of Project: 2015
Built area: 1264 m2
Tender estimate: 1,857,043.75 €
First phase project:  Cruise Terminal in the Port of Seville 2013

termex34
The Cruise Terminal in the Port of Seville will be expanded due to the increasing number of liners being received by the port. Now, cruise ships are expected all year round, therefore the Terminal will be both insulated and air-conditioned.
The new project includes doubling the original floor area and considerable improvement of its performances, thus meeting the promise of adaptability to the new needs of the original building. The environment is also rearranged by improving its general coherence. New fences have been designed, as well as providing better access and walkways for both pedestrians and vehicles that will make the terminal more accessible and safe. The construction work will start this autumn and the terminal will reopen early next year.

termex23

termex24

termex25

termex27

termex26

termex29

termex28

termex30

termex31

termex33

termex32